Search Filter

 

ROAD CONSTRUCTION NOTICE – Week of July 19, 2021

The Marlboro Summer/Fall Road program has begun and construction crews are performing concrete work at various locations throughout the town.  Updates will be sent throughout the road program season. 

We remind residents that, as per the recycling calendar (LINKED HERE), the road program is in progress and no lawn debris should be curbside until late September as crews pave, patch, repair potholes, and do street sweeping.  

Should you wish to report a pothole, please use our convenient, on-line POTHOLE PORTAL

ROAD CLOSED – CONSTRUCTION ADVISORY – POLICE PRESENT

Greenwood Road - Please be advised, on Monday (7/19) through Tuesday (7/20) from 7am-5pm, construction crews will be on Greenwood performing curb installations.   The road will remain accessible during construction, although motorists are advised to use caution through the work zone.  Police Officers will be site to assist motorists and residents.  Please call Marlboro Traffic and Safety at 732-536-0304 with further inquiries regarding this road work. 

Church Road - Please be advised, on Thursday (7/22) through Friday (7/23) from 7am-5pm, construction crews will be on Church Road performing curb restoration as necessary and installing handicap ramps at all intersections.   The road will remain accessible during construction, although motorists are advised to use caution through the work zone. 

Adam and Barclay Streets – Please be advised, on Monday (7/19) through Wednesday (7/21) from 7am-5pm, construction crews will be on Adams Street and Barclay Street performing curb restoration as necessary and installing handicap ramps at all intersections.  The road will remain accessible during construction, although motorists are advised to use caution through the work zone.

UPDATES:

Wyncrest Road – The Township will be repaving Wyncrest Road between Robertsville Road and Route 18 utilizing a $215,000 grant received from the State Department of Transportation.  This work is being coordinated with water system improvements at the intersection of Robertsville Road, Wyncrest Road and Brookside Circle.  Once the water main project is complete, Wyncrest Road and Brookside circle will be resurfaced along the project limits along with upgrades to the ADA curb ramps. The work is scheduled to be bid in the fall with construction of the water main to begin in 2021 and final completion anticipated in the spring of 2022. 

The scheduled time frame for roadwork is weather-dependent, and every effort will be made to minimize any inconvenience to residents during this time.  Please call Marlboro Traffic and Safety at 732-536-0304 with further inquiries.


732-536-0200 ext 1801