ROAD CONSTRUCTION NOTICE – Week of November 8, 2021
Please see below for road construction upcoming and in process.
Should you wish to report a pothole, please use our convenient, on-line POTHOLE PORTAL
Recycling Notice: Occasionally, a road closure will prevent a scheduled recycling collection. Should this occur, please email
ROAD TO REMAIN OPEN – CONSTRUCTION ADVISORY
These roads will remain accessible during construction, although motorists are advised to use caution through the work zone. The scheduled time frame for this work is weather-dependent, and every effort will be made to minimize any inconvenience to residents during this time.
Clubhouse Lane – Monday, November 8 through Friday, November 12 from 7am to 5pm, construction crews will be on Clubhouse Lane between Robertsville Road and Coventry Terrace performing curb restoration as necessary and installing handicapped ramps at all intersections.
Gary Drive - Monday, November 8 7am to 5pm construction crews will be on Gary Drive performing curb restoration as necessary and installing handicapped ramps at all intersections.
Victoria Court – Tuesday, November 9 and Wednesday, November 10 from 7am to 5pm construction crews will be Victoria Court performing curb restoration as necessary and installing handicap ramps.
Wicker Place and Thomas Lane – Thursday, November 11 and Friday, November 12 from 7am to 5pm construction crews will be at the intersection of Wicker Place and Thomas Lane and the surrounding vicinity performing curb restoration as necessary and installing handicap ramps.
ROAD TO REMAIN OPEN – CONSTRUCTION ADVISORY – NJDOT ONGOING
Route 79 Resurfacing –Beginning Thursday, November 4 from 8pm to 6am (overnight) until Wednesday, November 24 at the earliest, NJDOT Operations will begin resurfacing sections of Route 79 in various towns including Marlboro. Resurfacing work will take place Monday night through Friday night from 8pm to 6am using an alternating traffic pattern. As always, weather conditions could cause the work to continue following Thanksgiving weekend. As per NJODT specification, there will be no construction work from 11/24 at 6am to 11/29 at 8pm. Note, this resurfacing is separate from future, scheduled Capital Program Management Resurfacing Projects on Routes 79 and 34.
UPCOMING – FUNDED IN PART BY NJ DOT GRANT
Ryan Road - Mayor Jon Hornik and the Township Council are pleased to announce that Marlboro has been selected to receive funding from the NJ DOT Municipal Aid Program for the Ryan Road improvement project in the amount of $251,900. More to follow.
Union Hill Road - The Township will be repaving Union Hill Road between Clayton Road and the Manalapan border utilizing a $205,000 grant received from the State Department of Transportation. This work includes removal and replacement of deteriorated concrete curb and concrete curb and gutter, modifications to the intersection of Hawkins Road to improve the pedestrian crossing, upgrade of all curb ramps to meet ADA regulations, and the milling and resurfacing of the entire roadway surface. The work is scheduled to be bid in the winter with construction commencing in the spring of 2022.
Wyncrest Road - The Township will be repaving Wyncrest Road between Robertsville Road and Route 18 utilizing a $215,000 grant received from the State Department of Transportation. This work is being coordinated with water system improvements at the intersection of Robertsville Road, Wyncrest Road and Brookside Circle. Once the water main project is complete, Wyncrest Road and Brookside circle will be resurfaced along the project limits along with upgrades to the ADA curb ramps. The work is scheduled to be bid in the fall with construction of the water main to begin in 2021 and final completion anticipated in the spring of 2022.
The scheduled time frame for roadwork is weather-dependent, and every effort will be made to minimize any inconvenience to residents during this time. Please call Marlboro Traffic and Safety at 732-536-0304 with further inquiries.