Search Filter

ROAD CONSTRUCTION NOTICE – Week of May 22, 2023

Please see below for road construction notices in process and upcoming.    

Should you wish to report a pothole, please use our convenient, on-line POTHOLE PORTAL

Recycling Notice: Occasionally, a road closure will prevent a scheduled recycling collection.  Should this occur, please email This email address is being protected from spambots. You need JavaScript enabled to view it.  with your address and they will confirm a makeup date. 

Mayor Hornik announces $35mm 7-year road construction plan as an extension of his existing $10mm road repair initiative.  MORE…

CONSTRUCTION ADVISORY

ROAD TO REMAIN OPEN – PARTIAL DETOUR IN PLACE- POLICE PRESENT

These roads will remain accessible during construction, although lane shifts and detours will be in place as the work progresses.  Motorists are advised to use caution through the work zone. The scheduled time frame for this work is weather-dependent, and every effort will be made to minimize any inconvenience to residents during this time.

Robertsville Road - Tuesday (5/23) through Wednesday (5/24) from 7am-5pm, construction crews will be on Robertsville Road performing mill and pave operations between Wyncrest Road and the county bridge just south of Canadian Woods Road.  

Brookside circle and Woodstock Terrace - Tuesday (5/23) through Wednesday (5/24) from 7am-5pm, construction crews will be on Brookside Circle and Woodstock Terrace performing mill and pave operations.  

Wyncrest Road - Tuesday (5/30) through Friday (6/2) construction crews will be performing mill and pave operations between Robertsville Road and the NJSH Route 18 overpass.  Funded, in part, by a NJ DOT grant.  Please see below for details. 

PROJECTS FUNDED IN PART BY NJDOT GRANTS

Wyncrest Road: The Township will be repaving Wyncrest Road between Robertsville Road and Route 18 utilizing a $215,000 grant received from the State Department of Transportation.  This work was done in coordination with water system improvements at the intersection of Robertsville Road, Wyncrest Road and Brookside Circle.  The water main project is complete, Wyncrest Road and Brookside circle will be resurfaced along the project limits along with upgrades to the ADA curb ramps.

Ryan Road - Mayor Jon Hornik and the Township Council are pleased to announce that Marlboro has been selected to receive funding from the NJ DOT Municipal Aid Program for the Ryan Road improvement project in the amount of $251,900.  This project is in engineering design and is expected to go out to bid later this year. 

Union Hill Road: The Township will be repaving Union Hill Road between Clayton Road and the Manalapan border utilizing a $205,000 grant received from the State Department of Transportation.  This work includes removal and replacement of deteriorated concrete curb and concrete curb and gutter, modifications to the intersection of Hawkins Road to improve the pedestrian crossing, upgrade of all curb ramps to meet ADA regulations, and the milling and resurfacing of the entire roadway surface.

 

The scheduled time frame for roadwork is weather-dependent, and every effort will be made to minimize any inconvenience to residents during this time.  Please call Marlboro Traffic and Safety at 732-536-0304 with further inquiries.